Gelora Bung Tomo Stadium Renovation Project Completed
Stadium, Project Update
January 28, 2021

The Datra team finally succeeded in completing the installation of stadium seats at the Gelora Bung Tomo Stadium at the end of November 2020. We are completing this work amidst the challenges facing the COVID-19 pandemic. At the Gelora Bung Tomo Stadium, we installed a total of 45134 stadium seats with the following details:
- Economy Type Stadium Seat with simple mounting (Diamond Monoblock Simple Mount): 37839
- Economy Shared Stadium Seat with Support (Diamond Monoblock w / floor mounting shared): 2176
- Disabilities Chair (Diamond Flip Up Floor Mounting): 24
- Media Chair (Avant Hilo Floor Mounting): 88
- VIP (Diamond Flip-Up Floor Mounting): 4857
- VVIP Type 1 (Horit Floor Mounting): 126
- VVIP Type 2 (Ferco Sentul): 24
- Total Amount: 45134
This renovation was carried out to welcome the U20 World Cup in 2023. Because the Bung Tomo Stadium was appointed as one of the stadium nominations for the U20 World Cup. This renovation was successfully carried out due to the excellent cooperation of the Datra team and also the support of the Surabaya City Government who had entrusted this project to us. Hopefully in the future Datra Internusa can still present quality construction works for Indonesia.


